SINCOR DOWNSTREAM PROJECT

Site Preparation

Contracting Party:

Sincrudos de Oriente, S.A. (SINCOR)

Location:  

Oriente Petrochemical Complex. Venezuela

Execution date:

Feb 1998 - Feb 2000

Work done:

Earth moving; drainage works; canalization of the Hoces River.

YACAMBÚ - QUÍBOR HYDRAULIC SYSTEM

Water Regulation Works

Contracting Party:

Ministry of the Environment

Location:  

Quíbor, State of Lara, Venezuela

Execution date:

Jun 1991 – Aug 1999

Work done:

Construction of the gravel dam; right abutment containment dike; roller-compacted (RCC) dike; diversion tunnel; tailrace tunnel.

MACAGUA II HYDROELECTRIC PROJECT

2.500 MW

Contracting Party:

Electrificación del Caroní, C.A. (CVG - EDELCA)

Location:  

Ciudad Guayana, State of Bolívar, Venezuela

Execution date:

May 1991 – Mar 1997

Work done:

Construction of enrockment dam; discharge channels 2 and 3; construction of spur and distribution dikes; construction of concrete viaduct over the spillway.

DOLOMITE MINING

Volumen de Excavación 375.000 m3

Contracting Party:

Cemex de Venezuela, C.A. (VENCEMOS)

Location:  

Pertigalete, State of Anzoátegui, Venezuela

Execution date:

Jun 1995 – Sep 1996

Work done:

Explosives excavation; extraction; hauling.

TRUNK HIGHWAY 10

330 Km Stretch El Dorado - Santa Elena de Guairén

Contracting Party:

Corporación Venezolana de Guayana (CVG)

Location:  

Gran Sabana, State of Bolívar, Venezuela

Execution date:

May 1985 – Jun 1990

Work done:

Construction of embankment; drainage works; paving.

RAUL LEONI (GURI) HYDROELECTRIC PROJECT

10.000 MW

Contracting Party:

Electrificación del Caroní, C.A. (CVG - EDELCA)

Location:  

Guri, State of Bolívar, Venezuela

Execution date:

Feb 1980 – Sep 1985

Work done:

Construction of the left dam and side dikes.