COMPLETED PROJECTS

PIAR IRON AND STEEL COMPLEX

6,000 Ton/Year

Contracting Party:

Siderúrgica Nacional

Location:  

Ciudad Piar, State of Bolívar, Venezuela

Execution date:

Mar 2008 – Dec 2017

Work done:

Site preparation; construction of civil works.

PTAR VILLA RICA WATER TREATMENT PLANT

32 Lts/Seg

Contracting Party:

Consorcio Villa Rica

Location:  

Villa Rica, Oxapampa, Pasco, Perú

Execution date:

Oct 2015 - Aug 2017

Work done:

Engineering; construction; equipping; startup and operation under the turnkey modality.

COCHABAMBA - SANTA CRUZ HIGHWAY

55 Km Stretch Epizana - Valle Hermoso

Contracting Party:

Administradora Boliviana de Carreteras (ABC)

Location:  

Valle Hermoso, Department of Cochabamba, Bolivia

Execution date:

May 2015 – Ene 2017 // Mar 2020 - May 2024

Work done:

Construction of embankment; drainage works; paving.

ORIENTE PETROLERO DEL ECUADOR

ITT Oilfield - Tiputini Block

Contracting Party:

Petroamazonas E.P.

Location:  

Yasuni National Park Ecuador

Execution date:

Apr 2016 – Dec 2016

Work done:

Electromechanical facilities for early production at platforms A, B and C; expansion of early heating and pumping facilities (ECB); expansion of early processing facilities at CPT Tiputini.

EXCAVATION, LOADING AND HAULING OF IRON ORE

4.250.000 TON

Contracting Party:

Easter Mining Group Limited

Location:  

Ciudad Piar, State of Bolívar, Venezuela

Execution date:

Jun 2014 - Jun 2016

Work done:

Excavation, loading and hauling of iron ore.

CONSTRUCTION OF PILINGS

43 Perforated Pilings in Club Regatas Parking Structure

Contracting Party:

Pilotes Franki Peruana, S.A.C.

Location:  

Club Regatas, Chorrillos, Lima

Execution date:

Sep 2015 - Nov 2015

Work done:

Construction of 43 perforated pilings 80 cm in diameter; installation of recoverable linings; poured concrete.