TRUNK HIGHWAY 10

330 Km Stretch El Dorado - Santa Elena de Guairén

Contracting Party:

Gran Sabana, State of Bolívar, Venezuela

Location:

Corporación Venezolana de Guayana (CVG)

Execution date:

May 1985 – Jun 1990

Work done:

Construction of embankment; drainage works; paving.

• Excavation: 401.500 m3
• Embankment: 345,000 m3
• Paving: 1.056.000 Ton
• Drainage: 36” = 1.530 ml / 48” = 772 ml
• Concrete: 17.230 m3
• Flex Beam guard rails: 12,400 ml