PLATFORMS AND ACCESS ROADS FOR OPERATION AREAS

Civil Works

Contracting Party:

Petróleos de Venezuela, S.A. (PDVSA)

Location:  

State of Monagas, Venezuela

Execution date:

Jan 2010 - Dec 2011

Work done:

Earth moving; civil works; construction and road paving.

SIDOR THERMOELECTRIC POWER STATION

170 MW

Contracting Party:

Pro Energy Services

Location:  

Matanza, State of Bolívar, Venezuela

Execution date:

Feb 2010 – Mar 2011

Work done:

Site preparation; civil, mechanical and electrical works; line pipe.

FUEL SUPPLY PIPELINE FOR THERMOELECTRIC POWER STATION

Fabrication and Installation of Pipe Rack

Contracting Party:

Siderúrgica del Orinoco, C.A. (SIDOR)

Location:  

Ciudad Guayana, State of Bolívar, Venezuela

Execution date:

Feb 2010 - Mar 2011

Work done:

Fabrication and installation of pipe rack.

UNIVERSIDAD BOLIVARIANA

Construction of Maturín Campus

Contracting Party:

Petróleos de Venezuela, S.A. (PDVSA)

Location:  

Maturín, State of Monagas, Venezuela

Execution date:

Jul 2005 - Feb 2006

Work done:

Engineering, procurement, and construction foundations and structures housing administrative wing, classrooms and cafeteria.

CONSTRUCTION OF RAILWAY LINE EMBANKMENT

Stretch Tinaco - Anaco

Contracting Party:

China Railway Engineering Corporation (CREC)

Location:  

Chaguaramas, State of Guárico, Venezuela

Execution date:

Apr 2010 - Sep 2010

Work done:

Earth moving; drainage works; construction of embankment.

PORTO BELLO RESIDENTIAL COMPLEX

Construction of 18 - floor Building

Contracting Party:

Inversiones Porto Bello, C.A.

Location:  

Puerto La Cruz, State of Anzoátegui, Venezuela

Execution date:

Mar 2000 - Apr 2002

Work done:

Urban development works; construction of 18 - floor building (total area: 6.100 m2).