COMPLETED PROJECTS

SIDOR THERMOELECTRIC POWER STATION

170 MW

Contracting Party:

Pro Energy Services

Location:  

Matanza, State of Bolívar, Venezuela

Execution date:

Feb 2010 – Mar 2011

Work done:

Site preparation; civil, mechanical and electrical works; line pipe.

FUEL SUPPLY PIPELINE FOR THERMOELECTRIC POWER STATION

Fabrication and Installation of Pipe Rack

Contracting Party:

Siderúrgica del Orinoco, C.A. (SIDOR)

Location:  

Ciudad Guayana, State of Bolívar, Venezuela

Execution date:

Feb 2010 - Mar 2011

Work done:

Fabrication and installation of pipe rack.

CONSTRUCTION OF RAILWAY LINE EMBANKMENT

Stretch Tinaco - Anaco

Contracting Party:

China Railway Engineering Corporation (CREC)

Location:  

Chaguaramas, State of Guárico, Venezuela

Execution date:

Apr 2010 - Sep 2010

Work done:

Earth moving; drainage works; construction of embankment.

PORTO BELLO RESIDENTIAL COMPLEX

Construction of 18 - floor Building

Contracting Party:

Inversiones Porto Bello, C.A.

Location:  

Puerto La Cruz, State of Anzoátegui, Venezuela

Execution date:

Mar 2008 - Abr 2010

Work done:

Urban development works; construction of 18 - floor building (total area: 6.100 m2).

YACAMBÚ – QUÍBOR HYDRAULIC SYSTEM

25 Km Transfer Tunnel

Contracting Party:

Ministry of the Environment

Location:  

Quíbor, State of Lara, Venezuela

Execution date:

Jun 1995 – Sep 2009

Work done:

Digging the transfer tunnel.

CONSTRUCTION OF RAILWAY LINE EMBANKMENT

San Juan de los Morros - San Fernando de Apure Stretch

Contracting Party:

Astaldi, S.P.A.

Location:  

Calabozo, State of Guárico, Venezuela

Execution date:

Dec 2006 - Aug 2008

Work done:

Earth moving; drainage works; construction of embankment.