SIDOR THERMOELECTRIC POWER STATION

170 MW

Contracting Party:

Matanza, State of Bolívar, Venezuela

Location:

Pro Energy Services

Execution date:

Feb 2010 – Mar 2011

Work done:

Site preparation; civil, mechanical and electrical works; line pipe.

• Excavation for foundation: 16,000 m3
• Excavation of foundation for slab, pipelines, etc: 13,000 m3
• Concrete on main slab and isolated foundations: 5,200 m3
• Electric beds of 6-40 pipes: 1,600 ml
• Anchors: 15,000 Kg
• 6“-16“ fuel pipelines: 313,000 Kg
• Metallic structure for pipeline support: 120,000 Kg