Contracting Party:
Quíbor, State of Lara, Venezuela
Location:
Ministry of the Environment
Execution date:
Jun 1995 – Sep 2009
Work done:
Digging the transfer tunnel.
• Total length: 25,230 ml
• Excavation: 10.000 ml
• Average section: 21 m2
• Excavation volume: 210,000 m3
• Shotcrete: 151,360 m3