SIDOR THERMOELECTRIC POWER STATION

170 MW

Contracting Party:

Location: 

Pro Energy Services

Matanza, State of Bolívar, Venezuela 

Execution date: 

Feb 2010 – Mar 2011

Work done: 

Site preparation; civil, mechanical and electrical works; line pipe.

•   Excavation for foundation: 16,000 m3 
•   Excavation of foundation for slab, pipelines, etc: 13,000 m3   
•   Concrete on main slab and isolated foundations: 5,200 m3 

•   Electric beds of 6-40 pipes: 1,600 ml   

•   Anchors: 15,000 Kg 

•   6“-16“ fuel pipelines: 313,000 Kg         

•   Metallic structure for pipeline support: 120,000 Kg 