CARUACHI HYDROELECTRIC PROJECT
2.200 MW
Contracting Party:
Electrificación del Caroní, C.A. (CVG - EDELCA)
Location:
Execution date:
Ciudad Guayana, State of Bolívar, Venezuela
May 1997 – Jun 2001
Work done:
Construction of the left side of the earthen dam; construction of railroad embankment.
• Rock excavation: 1,510,000 m3
• Rock fill: 1,330,000 m3
• Concrete: 36.500 m3