top of page
HOME           THE COMPANY            DEVELOPMENT AREAS            PROJECTS             SOCIAL RESPONSIBILITY           MEDIA            CAREERS           CONTACT US

COMPLETED PROJECTS

TRUNK HIGHWAY 10  

330 Km Stretch El Dorado - Santa Elena de Guairén 

Contracting Party:

Corporación Venezolana de Guayana  (CVG)

Location: 

Execution date: 

Work done: 

Gran Sabana, State of Bolívar, Venezuela

May 1985 – Jun 1990

Construction of embankment; drainage works; paving.

•   Excavation: 401.500 m3

•   Embankment: 345,000 m3 

•   Paving: 1.056.000 Ton

•   Drainage: 36” = 1.530 ml / 48” = 772 ml 

•   Concrete: 17.230 m3

•   Flex Beam guard rails: 12,400 ml

bottom of page