SINCOR DOWNSTREAM PROJECT
Site Preparation
Contracting Party:
Sincrudos de Oriente, S.A. (SINCOR)
Location:
Execution date:
Oriente Petrochemical Complex. Venezuela
Feb 1998 - Feb 2000
Work done:
Earth moving; drainage works; canalization of the Hoces River.
• Total volume of earth moving: 2,428,855 m3
• Structural concrete: 16,526 m3
• Steel: 1,053,064 Kg
• Concrete pipes: 4,820 ml