COMPLETED PROJECTS

RAUL LEONI (GURI) HYDROELECTRIC PROJECT

10.000 MW

1
2
3
5
6
7
8
9
910
911

Contracting Party:

Electrificación del Caroní, C.A. (CVG - EDELCA)

Location: 

Guri, State of Bolívar, Venezuela

Execution date: 

Feb 1980 – Sep 1985

Work done: 

Construction of the left dam and side dikes.

•   Clay fills: 13.000.000 m3 
•   Rock fill: 3.500.000 m3 
•   Filters: 750.000 m3 
•   Preparation of site for foundation: 110.000 m2 

•   Concrete: 9.000 m3