RAUL LEONI (GURI) HYDROELECTRIC PROJECT

10.000 MW

Contracting Party:

Guri, State of Bolívar, Venezuela

Location:

Electrificación del Caroní, C.A. (CVG - EDELCA)

Execution date:

Feb 1980 – Sep 1985

Work done:

Construction of the left dam and side dikes.

• Clay fills: 13.000.000 m3
• Rock fill: 3.500.000 m3
• Filters: 750.000 m3
• Preparation of site for foundation: 110.000 m2
• Concrete: 9.000 m3