CARUACHI HYDROELECTRIC PROJECT

2.200 MW

Contracting Party:

Ciudad Guayana, State of Bolívar, Venezuela

Location:

Electrificación del Caroní, C.A. (CVG - EDELCA)

Execution date:

May 1997 – Jun 2001

Work done:

Construction of the left side of the earthen dam; construction of railroad embankment.

• Rock excavation: 1,510,000 m3
• Rock fill: 1,330,000 m3
• Concrete: 36.500 m3